Skip to main content
  • Emblem ALL UNIVERSAL
    • Universal Menu Logo
    • High-Touch Services
      • Universal® Trip Support
      • Global Regulatory Services
      • Aviation Emissions Management
      • Ground Handling Network
      • In-Flight Catering
      • Airport VIP Services
    • Digital Products & Services
      • Feasibility-IQ® Trip Support Software
      • uvGO® Mission Management Platform
      • Airport & FBO Data API
    • Company
      • About
      • Press Releases
      • Industry Events
      • Our Brands
      • Ethics and Compliance
    • Universal Home
      • Contact Us
  • BLOG
  • FIQ LOGIN
Universal Weather and Aviation Inc Logo
  • HOME
  • uvGO GUIDE
  • VENDORS AND PARTNERS
  • CONTACT US
  • BLOG
  • FIQ LOGIN
  • SEARCH
  1. Knowledge Base
  2. uvGO Guide
  3. uvGO Release Notes

uvGO IOS v2024.22.0

Anthony Church
  • December 16, 2024 22:42
  • Updated

Release Date: 11/14/2024

 

Feasibility-IQ Slot Times

You can now view the time required to obtain Slots.

When navigating to Slots, you can view the average lead time and the processing time required before operation.

How to view it:

      • Tap Feasibility – IQ
      • Enter your airport
      • Tap Get Info
      • Tap Airport Level Permissions
      • Tap Slots
      • The slot tolerance is located on the right side of the page.

Feasibility-IQ PPR Times

You can now view the time required to obtain Prior Permission Requirements (PPR).

When navigating to PPR, you can view the average lead time and the processing time required before operation.

How to view it:

      • Tap Feasibility – IQ
      • Enter your airport
      • Tap Get Info
      • Tap Airport Level Permissions
      • Tap PPR
      • The PPR tolerance is located on the right side of the page.

Feasibility-IQ UAA

We have replaced Air to Ground (A2G) with Universal Aviation Agent (UAA) in the airport header.

We have replaced A2G with UAA in the airport header to reflect the rebranding from A2G to UAA.

How to view it:

      • Tap Feasibility – IQ
      • Enter an airport in the ICAO field
      • Tap Get Info
      • UAA is displayed in the top right of the Airports Info page below the Share icon

Feasibility-IQ Permits Generic Aircraft

You can now run Permits with a generic aircraft, enabling users without a specific aircraft associated with their account to access the Permits feature.

We have added a General Aircraft button to the Feasibility Permits header so that you can select generic aircraft to run a Permit.

How to use it:

      • Tap Feasibility-IQ
      • Tap Permits
      • Select Generic Aircraft located between Registry and Use RC Number in the header
      • Tap in the Generic Aircraft Type field
      • Tap Use Generic Aircraft Finder
      • Tap Select a Manufacturer dropdown
      • Select a Manufacturer
      • Select your desired aircraft
      • Proceed as normal

Bug Fixes and Performance Enhancements

Was this article helpful?
0 out of 0 found this helpful

Related articles

  • View a handling report
  • uvGO IOS v2022.23.0
  • uvGO online v2024.22.0
  • uvGO IOS v2024.21.0

Comments

0 comments

Please sign in to leave a comment.

Need Immediate Assistance?

Contact our Customer Care team directly at

  • N. America +1 (800) 793-1295
  • Worldwide +1 (713) 378-2778
  • Email uvGOsupport@univ-wea.com
NEED IMMEDIATE ASSISTANCE?

Contact our Customer Care team directly at

  • N. America +1 (800) 793-1295
  • Worldwide +1 (713) 378-2778
  • Email uvGOsupport@univ-wea.com

© 2025 Universal Weather and Aviation, Inc. | Privacy Policy | Legal